|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 37: WIP Control
 | A. Andijani, "Trade-Off Between Maximizing Throughput Rate And
Minimizing System Time In Kanban Systems," International Journal of
Operations & Production Management, Vol. 17, No. 5-6, 429-445, 1997. |
 | A. Ardalan, "Analysis of Local Decision Rules In A Dual-Kanban Flow
Shop," Decision Sciences, Vol. 28, No. 1, 195-211, 1997. |
 | S. Bilgin and M. Nishimura, "Implementation of a WIP Modeling System at LSI Logic," 2003 IEEE International Symposium on Semiconductor Manufacturing (ISSM '03), 293-296, 2003. The authors are from LSI Logic Corp., Gresham, OR, USA. |
 | A. M. Bonvik, C. Couch, and S. B. Gershwin, "A Comparison of
Production Line Control Mechanisms," International Journal of
Production Research, Vol. 35, No. 3, 789-804, 1997. |
 | A. M. Bonvik and S. B. Gershwin, "Beyond Kanban: Creating and
Analyzing Lean Shop Floor Control Policies," Working Paper, Operations
Research Center, MIT Presented at the Manufacturing and Service Operations
Management conference, June, 1996. |
 | M. Di Mascalo, Y. Frein, and Y. Dallery, "An Analytical Method for
Performance Evaluation of Kanban Controlled Production Systems,"
Operations Research, Vol. 44, No. 1, 50-64, 1996. |
 | I. Duenyas, W. J. Hopp, and Y. Bassok, "Production Quotas As Bounds
On Interplant JIT Contracts," Management Science, Vol. 43, No. 10,
1372-1386, 1997. |
 | Markus Ettl and Hansjoerg Fromm, "Determination of Optimal Kanban
Allocation Patterns in Serial Production Lines," IBM Research Report RC
20158, 1995. Available online at http://domino.watson.ibm.com/library/CyberDig.nsf/Home. |
 | W. J. Hopp and M. L. Spearman, "Throughput of a Constant Work in
Process Manufacturing Line Subject to Failures," International Journal
of Production Research, Vol. 29, No. 3, 635-655, 1991. |
 | W. J. Hopp, M. L. Spearman, and D. L. Woodruff, "Hyper-JIT:
Hierarchical Planning for Extended-Range Just-In-Time," Technical
Report No. 89-06, Department of Industrial Engineering and Management
Sciences, Northwestern University, 1989. |
 | H. Ishii and T. Nose, "Perishable Inventory Control with Two Types of
Customers and Different Selling Prices Under the Warehouse Capacity
Constraint," International Journal of Production Economics, Vol. 44,
No. 1-2, 167-176, 1996. |
 | U. S. Karmarkar and S. Kekre, "Batching Policy in Kanban
Systems," Journal of Manufacturing Systems, Vol. 8, No. 4, 317-328,
1989. |
 | L. J. Krajewski, B. E. King, L. P. Ritzman, and D. S. Wong, "Kanban,
MRP, and Shaping the Manufacturing Environment," Management Science,
Vol. 33, No. 1, 39-57, 1987. |
 | Wei Jie Lee, "Optimize WIP Scale through Simulation Approach with WIP, Turn-Over Rate and Cycle Time Regression Analysis in Semiconductor Fabrication," Proceedings of the 2002 Semiconductor Manufacturing Technology Conference, 299-301, 2002. The author is from UMC, Hsinchu, Taiwan. |
 | Y. H. Lin and C. E. Lee, "A Total Standard WIP Estimation Method for
Wafer Fabrication," European Journal of Operational Research, Vol. 131,
No. 1, 78-94, 2001. |
 | D. Mitra and I. Mitrani, "Analysis of a Kanban Discipline for Cell
Coordination in Production Lines," Management Science, Vol. 36, No. 12,
1548-1566, 1990. |
 | F. Moeeni, S. M. Sanchez, A. J. Vakharia, "A Robust Design
Methodology For Kanban System Design," International Journal of
Production Research, Vol. 35, No. 10, 2821-2838, 1997. |
 | J. A. Muckstadt, "Some Approximations in Multi-Item, Multi-Echelon
Inventory Systems For Recoverable Items," Naval Research Quarterly,
Vol. 25, No. 2, 377-378, 1978. |
 | Ko Chen Pin, Lee Yen Fei, Ang Chee Teck, "Two Approaches to Determine Appropriated Fab Manufacturing Production Plan by Cycle-Time and WIP Energy," 2001 IEEE International Symposium on Semiconductor Manufacturing (ISSM '01), 87-90, 2001. The authors are from Manuf. Dept., Syst. on Silicon Manuf. Co. Pte. Ltd., Singapore. |
 | R. Ramesh, S. Y. Prasad, and M. V. Thirumurthy, "Flow Control In
Kanban Based Multicell Manufacturing. 2. Design Of Control Systems And
Experimental Results," International Journal of Production Research,
Vol. 35, No. 9, 2413-2427, 1997. |
 | M. S. Seppanen, "Kanban Simulator Using SIMAN and Lotus 1-2-3,"
Proceedings of the 1993 Winter Simulation Conference, Los Angeles, CA,
838-843, 1993. |
 | M. L. Spearman, "Customer Service in Pull Production Systems,"
Operations Research, Vol. 40, No. 5, 948-958, 1992. |
 | M. L. Spearman, D. L. Woodruff, and W. J. Hopp, "CONWIP: A Pull
Alternative to Kanban," International Journal of Production Research,
Vol. 28, No. 5, 879-894, 1990. |
 | M. L. Spearman and M. A. Zazanis, "Push and Pull Production Systems:
Issues and Comparisons," Operations Research, Vol. 40, No. 3, 521-532,
1992. |
 | W. Zhang and M. Y. Chen, "A Mathematical Programming Model For
Production Planning Using CONWIP," International Journal of Production
Research, Vol. 39, No. 12, 2723-2734, 2001. |

|