Jennifer K. Robinson Consulting

Home Background Publications Definitions Capacity Biblio. Queueing Biblio.

 

Back
Up
Next

 

A Bibliography on Capacity Modeling for Semiconductor Manufacturing

Section 37: WIP Control

bulletA. Andijani, "Trade-Off Between Maximizing Throughput Rate And Minimizing System Time In Kanban Systems," International Journal of Operations & Production Management, Vol. 17, No. 5-6, 429-445, 1997.
bulletA. Ardalan, "Analysis of Local Decision Rules In A Dual-Kanban Flow Shop," Decision Sciences, Vol. 28, No. 1, 195-211, 1997.
bulletS. Bilgin and M. Nishimura, "Implementation of a WIP Modeling System at LSI Logic," 2003 IEEE International Symposium on Semiconductor Manufacturing (ISSM '03), 293-296, 2003. The authors are from LSI Logic Corp., Gresham, OR, USA.
bulletA. M. Bonvik, C. Couch, and S. B. Gershwin, "A Comparison of Production Line Control Mechanisms," International Journal of Production Research, Vol. 35, No. 3, 789-804, 1997.
bulletA. M. Bonvik and S. B. Gershwin, "Beyond Kanban: Creating and Analyzing Lean Shop Floor Control Policies," Working Paper, Operations Research Center, MIT Presented at the Manufacturing and Service Operations Management conference, June, 1996.
bulletM. Di Mascalo, Y. Frein, and Y. Dallery, "An Analytical Method for Performance Evaluation of Kanban Controlled Production Systems," Operations Research, Vol. 44, No. 1, 50-64, 1996.
bulletI. Duenyas, W. J. Hopp, and Y. Bassok, "Production Quotas As Bounds On Interplant JIT Contracts," Management Science, Vol. 43, No. 10, 1372-1386, 1997.
bulletMarkus Ettl and Hansjoerg Fromm, "Determination of Optimal Kanban Allocation Patterns in Serial Production Lines," IBM Research Report RC 20158, 1995. Available online at http://domino.watson.ibm.com/library/CyberDig.nsf/Home.
bulletW. J. Hopp and M. L. Spearman, "Throughput of a Constant Work in Process Manufacturing Line Subject to Failures," International Journal of Production Research, Vol. 29, No. 3, 635-655, 1991.
bulletW. J. Hopp, M. L. Spearman, and D. L. Woodruff, "Hyper-JIT: Hierarchical Planning for Extended-Range Just-In-Time," Technical Report No. 89-06, Department of Industrial Engineering and Management Sciences, Northwestern University, 1989.
bulletH. Ishii and T. Nose, "Perishable Inventory Control with Two Types of Customers and Different Selling Prices Under the Warehouse Capacity Constraint," International Journal of Production Economics, Vol. 44, No. 1-2, 167-176, 1996.
bulletU. S. Karmarkar and S. Kekre, "Batching Policy in Kanban Systems," Journal of Manufacturing Systems, Vol. 8, No. 4, 317-328, 1989.
bulletL. J. Krajewski, B. E. King, L. P. Ritzman, and D. S. Wong, "Kanban, MRP, and Shaping the Manufacturing Environment," Management Science, Vol. 33, No. 1, 39-57, 1987.
bulletWei Jie Lee, "Optimize WIP Scale through Simulation Approach with WIP, Turn-Over Rate and Cycle Time Regression Analysis in Semiconductor Fabrication," Proceedings of the 2002 Semiconductor Manufacturing Technology Conference, 299-301, 2002. The author is from UMC, Hsinchu, Taiwan.
bulletY. H. Lin and C. E. Lee, "A Total Standard WIP Estimation Method for Wafer Fabrication," European Journal of Operational Research, Vol. 131, No. 1, 78-94, 2001.
bulletD. Mitra and I. Mitrani, "Analysis of a Kanban Discipline for Cell Coordination in Production Lines," Management Science, Vol. 36, No. 12, 1548-1566, 1990.
bulletF. Moeeni, S. M. Sanchez, A. J. Vakharia, "A Robust Design Methodology For Kanban System Design," International Journal of Production Research, Vol. 35, No. 10, 2821-2838, 1997.
bulletJ. A. Muckstadt, "Some Approximations in Multi-Item, Multi-Echelon Inventory Systems For Recoverable Items," Naval Research Quarterly, Vol. 25, No. 2, 377-378, 1978.
bulletKo Chen Pin, Lee Yen Fei, Ang Chee Teck, "Two Approaches to Determine Appropriated Fab Manufacturing Production Plan by Cycle-Time and WIP Energy," 2001 IEEE International Symposium on Semiconductor Manufacturing (ISSM '01), 87-90, 2001. The authors are from Manuf. Dept., Syst. on Silicon Manuf. Co. Pte. Ltd., Singapore.
bulletR. Ramesh, S. Y. Prasad, and M. V. Thirumurthy, "Flow Control In Kanban Based Multicell Manufacturing. 2. Design Of Control Systems And Experimental Results," International Journal of Production Research, Vol. 35, No. 9, 2413-2427, 1997.
bulletM. S. Seppanen, "Kanban Simulator Using SIMAN and Lotus 1-2-3," Proceedings of the 1993 Winter Simulation Conference, Los Angeles, CA, 838-843, 1993.
bulletM. L. Spearman, "Customer Service in Pull Production Systems," Operations Research, Vol. 40, No. 5, 948-958, 1992.
bulletM. L. Spearman, D. L. Woodruff, and W. J. Hopp, "CONWIP: A Pull Alternative to Kanban," International Journal of Production Research, Vol. 28, No. 5, 879-894, 1990.
bulletM. L. Spearman and M. A. Zazanis, "Push and Pull Production Systems: Issues and Comparisons," Operations Research, Vol. 40, No. 3, 521-532, 1992.
bulletW. Zhang and M. Y. Chen, "A Mathematical Programming Model For Production Planning Using CONWIP," International Journal of Production Research, Vol. 39, No. 12, 2723-2734, 2001.

 
This page belongs to Jennifer Robinson, at www.jkrconsult.com. If you have comments, please use the contact form on the website home page. You can also reach me via my personal blog. All jkrconsult web pages are copyright (c) 1999-2006 by Jennifer Robinson. All Rights Reserved.