|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 34: Setup and Dedication
 | M. Arosio and A. Sianesi, "A Heuristic Algorithm for Master
Production Schedule Generation with Finite Capacity and Sequence Dependent
Setups," International Journal of Production Research, Vol. 31, No. 3,
531-553, 1993. |
 | G. Bhaskar and T. T. Narendran, "Grouping PCBs for Set-Up Reduction:
A Maximum Spanning Tree Approach," International Journal of Production
Research, Vol. 34, No. 3, 621-632, 1996. |
 | L. Bianco, S. Ricciardelli, G. Rinaldi, and A. Sassano, "Scheduling
Task with Sequence-Dependent Processing Times," Naval Research
Logistics, Vol. 35, 177-184, 1988. |
 | G. R. Bitran and S. M. Gilbert, "Sequencing Production on Parallel
Machines with Two Magnitudes of Sequence-Dependent Setup Cost," Journal
of Manufacturing and Operations Management, Vol. 3, No. 1, 24-52, 1990. |
 | O. E. Charles-Owaba and B. K. Lambert, "Sequence Dependent Machine
Set-Up Times and Similarity of Parts: A Mathematical Model," IIE
Transactions, Vol. 20, No. 1, 12-21, 1988. |
 | B. L. Dietrich and L. F. Escudero, "On Modeling the Maximum Workload
Allocation for Parallel Unrelated Machines with Setups," Annals of
Operations Research, Vol. 43, 359-377, 1993. |
 | B. L. Dietrich, J. Lee, and Y. S. Lee, "Order Selection on a Single
Machine with High Set-Up Costs," Annals of Operations Research, Vol.
43, 379-396, 1993. |
 | D. M. Dilts, "The Sensitivity of Set-Up Cost Estimation on the
Problem of Joint Lot Sizing and Scheduling," International Journal of
Production Research, Vol. 29, No. 1, 77-93, 1991. |
 | A. Federgruen and Z. Katalan, "The Impact of Setup Times on the
Performance of Multiclass Service and Production Systems," Operations
Research, Vol. 44, No. 6, 989-1001, 1996. |
 | A. Guinet, "Scheduling Sequence-Dependent Jobs on Identical Parallel
Machines to Minimize Completion Time Criteria," International Journal
of Production Research, Vol. 31, No. 7, 1579-1594, 1993. |
 | T. C. Hu, Y. S. Kuo and F. Ruskey, "Some Optimum Algorithms for
Scheduling Problems with Changeover Costs," Operations Research, Vol.
35, No. 1, 94-99, 1987. |
 | S. Kang, K. Malik, and L. J. Thomas, "Lotsizing and Scheduling on
Parallel Machines with Sequence-Dependent Setup Costs," Management
Science, Vol. 45, No. 2, 273-289, 1999. |
 | Y. H. Lee, K. Bhaskaran and M. Pinedo, "A Heuristic to Minimize the
Total Weighted Tardiness with Sequence Dependent Setups," Department of
Industrial Engineering and Operations Research, 1-20, 1991. |
 | Y. H. Lee and M. Pinedo, "Scheduling Jobs On Parallel Machines With
Sequence-Dependent Setup Times," European Journal of Operational
Research, Vol. 100, No. 3, 464-474, 1997. |
 | A. G. Lockett and A. P. Muhlemann, "Technical Notes: A Scheduling
Problem Involving Sequence Dependent Changeover Times," Operations
Research, Vol. 20, 895-902, 1972. |
 | F. Mahmoodi, and G. E. Martin, "A New Shop-Based And Predictive
Scheduling Heuristic For Cellular Manufacturing," International Journal
of Production Research, Vol. 35, No. 2, 313-326, 1997. |
 | C. L. Monma and C. N. Potts, "On the Complexity of Scheduling with
Batch Setup Times," Operations Research, Vol. 37, No. 5, 798-804, 1989. |
 | T. J. Nye, E. M. Jewkes, and D. M. Dilts, "Optimal Investment in
Setup Reduction in Manufacturing Systems with WIP Inventories,"
European Journal of Operational Research, Vol. 135, No. 1, 128-141,
2001. |
 | S. Park, J. W. Fowler, M. Hickie, and M. Carlyle, "Assessment of
Potential Gains in Productivity Due to Proactive Reticle Management Using
Discrete Event Simulation," Proceedings of the 1999 Winter Simulation
Conference, 1999. |
 | M. I. Reiman and L. M. Wein, "Dynamic Scheduling Of A Two-Class Queue
With Setups," Operations Research, Vol. 46, No. 4, 532-547, 1998. |
 | A. M. Spence and E. L. Porteus, "Setup Reduction and Increased
Effective Capacity," Management Science, Vol. 33, No. 10, 1291-1301,
1987. |
 | N. Srivatsan and S. B. Gershwin, "Selection of Setup Times in a
Hierarchically Controlled Manufacturing System," Report No. LMP-90-015,
Laboratory for Manufacturing and Productivity, Massachusetts Institute of
Technology, 1990. |
 | R. Sunkara and R. Rao, "A Heuristic to Determine Equipment Setup
Changes Based on Estimated Lot Arrivals in a Semiconductor Fab,"
Proceedings of the 2004 Winter Simulation Conference, Washington, DC, Dec.
5-8, 2004. |
 | C. S. Tang, "Scheduling Batches on Parallel Machines with Major and
Minor Set-Ups," European Journal of Operational Research, Vol. 46,
28-37, 1990. |
 | A. T. Unal, A. S. Kiran, and R. Uzsoy, "Due Date Determination on a
Single Machine with Part Type Dependent Setup Times," Research
Memorandum No. 91-22, Purdue University Department of Industrial
Engineering, 1991. |
 | R. Uzsoy, C.-Y. Lee, and L. A. Martin-Vega, "Scheduling Semiconductor
Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on A
Single Machine," Naval Research Logistics, Vol. 39, No. 3, 369-388,
1992. |
 | D. L. Woodruff and M. L. Spearman, "Sequencing and Batching for Two
Classes of Jobs with Deadlines and Setup Times," Production and
Operations Management, Vol. 1, No. 1, 87-102, 1992. |
 | C. Zhou and P. J. Egbelu, "Scheduling in a Manufacturing Shop with
Sequence-Dependent Setups," Robotics and Computer-Integrated
Manufacturing, Vol. 5, No. 1, 73-81, 1989. |

|