Jennifer K. Robinson Consulting

Home Background Publications Definitions Capacity Biblio. Queueing Biblio.

 

Back
Up
Next

 

A Bibliography on Capacity Modeling for Semiconductor Manufacturing

Section 34: Setup and Dedication

bulletM. Arosio and A. Sianesi, "A Heuristic Algorithm for Master Production Schedule Generation with Finite Capacity and Sequence Dependent Setups," International Journal of Production Research, Vol. 31, No. 3, 531-553, 1993.
bulletG. Bhaskar and T. T. Narendran, "Grouping PCBs for Set-Up Reduction: A Maximum Spanning Tree Approach," International Journal of Production Research, Vol. 34, No. 3, 621-632, 1996.
bulletL. Bianco, S. Ricciardelli, G. Rinaldi, and A. Sassano, "Scheduling Task with Sequence-Dependent Processing Times," Naval Research Logistics, Vol. 35, 177-184, 1988.
bulletG. R. Bitran and S. M. Gilbert, "Sequencing Production on Parallel Machines with Two Magnitudes of Sequence-Dependent Setup Cost," Journal of Manufacturing and Operations Management, Vol. 3, No. 1, 24-52, 1990.
bulletO. E. Charles-Owaba and B. K. Lambert, "Sequence Dependent Machine Set-Up Times and Similarity of Parts: A Mathematical Model," IIE Transactions, Vol. 20, No. 1, 12-21, 1988.
bulletB. L. Dietrich and L. F. Escudero, "On Modeling the Maximum Workload Allocation for Parallel Unrelated Machines with Setups," Annals of Operations Research, Vol. 43, 359-377, 1993.
bulletB. L. Dietrich, J. Lee, and Y. S. Lee, "Order Selection on a Single Machine with High Set-Up Costs," Annals of Operations Research, Vol. 43, 379-396, 1993.
bulletD. M. Dilts, "The Sensitivity of Set-Up Cost Estimation on the Problem of Joint Lot Sizing and Scheduling," International Journal of Production Research, Vol. 29, No. 1, 77-93, 1991.
bulletA. Federgruen and Z. Katalan, "The Impact of Setup Times on the Performance of Multiclass Service and Production Systems," Operations Research, Vol. 44, No. 6, 989-1001, 1996.
bulletA. Guinet, "Scheduling Sequence-Dependent Jobs on Identical Parallel Machines to Minimize Completion Time Criteria," International Journal of Production Research, Vol. 31, No. 7, 1579-1594, 1993.
bulletT. C. Hu, Y. S. Kuo and F. Ruskey, "Some Optimum Algorithms for Scheduling Problems with Changeover Costs," Operations Research, Vol. 35, No. 1, 94-99, 1987.
bulletS. Kang, K. Malik, and L. J. Thomas, "Lotsizing and Scheduling on Parallel Machines with Sequence-Dependent Setup Costs," Management Science, Vol. 45, No. 2, 273-289, 1999.
bulletY. H. Lee, K. Bhaskaran and M. Pinedo, "A Heuristic to Minimize the Total Weighted Tardiness with Sequence Dependent Setups," Department of Industrial Engineering and Operations Research, 1-20, 1991.
bulletY. H. Lee and M. Pinedo, "Scheduling Jobs On Parallel Machines With Sequence-Dependent Setup Times," European Journal of Operational Research, Vol. 100, No. 3, 464-474, 1997.
bulletA. G. Lockett and A. P. Muhlemann, "Technical Notes: A Scheduling Problem Involving Sequence Dependent Changeover Times," Operations Research, Vol. 20, 895-902, 1972.
bulletF. Mahmoodi, and G. E. Martin, "A New Shop-Based And Predictive Scheduling Heuristic For Cellular Manufacturing," International Journal of Production Research, Vol. 35, No. 2, 313-326, 1997.
bulletC. L. Monma and C. N. Potts, "On the Complexity of Scheduling with Batch Setup Times," Operations Research, Vol. 37, No. 5, 798-804, 1989.
bulletT. J. Nye, E. M. Jewkes, and D. M. Dilts, "Optimal Investment in Setup Reduction in Manufacturing Systems with WIP Inventories," European Journal of Operational Research, Vol. 135, No. 1, 128-141, 2001. 
bulletS. Park, J. W. Fowler, M. Hickie, and M. Carlyle, "Assessment of Potential Gains in Productivity Due to Proactive Reticle Management Using Discrete Event Simulation," Proceedings of the 1999 Winter Simulation Conference, 1999.
bulletM. I. Reiman and L. M. Wein, "Dynamic Scheduling Of A Two-Class Queue With Setups," Operations Research, Vol. 46, No. 4, 532-547, 1998.
bulletA. M. Spence and E. L. Porteus, "Setup Reduction and Increased Effective Capacity," Management Science, Vol. 33, No. 10, 1291-1301, 1987.
bulletN. Srivatsan and S. B. Gershwin, "Selection of Setup Times in a Hierarchically Controlled Manufacturing System," Report No. LMP-90-015, Laboratory for Manufacturing and Productivity, Massachusetts Institute of Technology, 1990.
bulletR. Sunkara and R. Rao, "A Heuristic to Determine Equipment Setup Changes Based on Estimated Lot Arrivals in a Semiconductor Fab," Proceedings of the 2004 Winter Simulation Conference, Washington, DC, Dec. 5-8, 2004.
bulletC. S. Tang, "Scheduling Batches on Parallel Machines with Major and Minor Set-Ups," European Journal of Operational Research, Vol. 46, 28-37, 1990.
bulletA. T. Unal, A. S. Kiran, and R. Uzsoy, "Due Date Determination on a Single Machine with Part Type Dependent Setup Times," Research Memorandum No. 91-22, Purdue University Department of Industrial Engineering, 1991.
bulletR. Uzsoy, C.-Y. Lee, and L. A. Martin-Vega, "Scheduling Semiconductor Test Operations: Minimizing Maximum Lateness and Number of Tardy Jobs on A Single Machine," Naval Research Logistics, Vol. 39, No. 3, 369-388, 1992.
bulletD. L. Woodruff and M. L. Spearman, "Sequencing and Batching for Two Classes of Jobs with Deadlines and Setup Times," Production and Operations Management, Vol. 1, No. 1, 87-102, 1992.
bulletC. Zhou and P. J. Egbelu, "Scheduling in a Manufacturing Shop with Sequence-Dependent Setups," Robotics and Computer-Integrated Manufacturing, Vol. 5, No. 1, 73-81, 1989.

 
This page belongs to Jennifer Robinson, at www.jkrconsult.com. If you have comments, please use the contact form on the website home page. You can also reach me via my personal blog. All jkrconsult web pages are copyright (c) 1999-2006 by Jennifer Robinson. All Rights Reserved.