|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 29: Real-Time Control: General
 | R. Akella, "Real Time Part Dispatch in Flexible Assembly Test and
Manufacturing Systems," Carnegie Mellon University. |
 | S. X. Bai, "Scheduling Manufacturing Systems with Work-in-Progress
Inventory Control," Report No. LMP-91-037, Laboratory for Manufacturing
and Productivity, Massachusetts Institute for Technology, 1991. See also
Proceedings of the 29th IEEE Conference on Decision and Control Part 2,
Honolulu, HI, 1990. |
 | S. X. Bai and S. B. Gershwin, "Scheduling Manufacturing Systems with
Work-in-Process Inventory Control: Single-Part-Type Systems," Report
No. LMP-90-003, Laboratory for Manufacturing and Productivity, Massachusetts
Institute of Technology, 1990. |
 | S. B. Gershwin, R. Akella, and Y. F. Choong, "Short-Term Production
Scheduling of an Automated Manufacturing Facility," IBM Journal of
Research and Development, Vol. 29, No. 4, 1985. |
 | K. Hadavi and M. Shahraray, "Release No Job Before its Time,"
Proceedings of the Third International Conference on Expert Systems and the
Leading Edge in Production & Operations Management, 1989. |
 | J. Kimemia and S. B. Gershwin, "An Algorithm for the Computer Control
of a Flexible Manufacturing System," IIE Transactions, Vol. 15, No. 4,
353-362, 1983. |
 | P.R. Kumar and T. I. Seidman, "Dynamic Instabilities and
Stabilization Methods in Distributed Real-Time Scheduling of Manufacturing
Systems," IEEE Transactions on Automatic Control, Vol. 35, No. 3,
289-298, 1990. |
 | M. H. Lee, "The Knowledge-Based Factory," Artificial
Intelligence in Engineering, Vol.8, 109-125, 1993. |
 | S. Lou, S. Sethi, and G. Sorger, "Analysis of a Class of Real-Time
Multiproduct Lot Scheduling Policies," IEEE Transactions on Automatic
Control, Vol. 36, No. 2, 243-248, 1991. |
 | J. R. Perkins and P. R. Kumar, "Stable, Distributed, Real-Time
Scheduling of Flexible Manufacturing/Assembly/Disassembly Systems,"
IEEE Transactions on Automatic Control, Vol. 34, No. 2, 139-148, 1989. |
 | R. Roundy, W. Maxwell, Y. Herer, S. Tayur, and A. Getzler, "A
Price-Directed Approach to Real-Time Scheduling of Production
Operations," Technical Report No. 823, School of Operations Research
and Industrial Engineering, Cornell University, 1988. |
 | J. Violette and S. B. Gershwin, "Decomposition of Control in a
Hierarchical Framework for Manufacturing Systems," Laboratory for
Manufacturing and Productivity, Massachusetts Institute of Technology.
Presented at the 1991 Automatic Control Conference, June 1991. |
 | K-S Wang, H-W Hsia and Z-D Zhuang, "An Intelligent Decision System
for a Modern Manufacturing System," Int. J. Computer Integrated
Manufacturing, Vol. 6, No. 5, 281-292, 1993. |
 | L. M. Wein and J. Ou, "The Impact of Processing Time Knowledge on
Dynamic Job-Shop Scheduling," Management Science, Vol. 37, No. 8,
1002-1014, 1991. |

|