|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 20: Operators
 | A. Acri, A. Markowski, and R. Rerick, "The Implementation of a Performance Management System in an 8 Inch Fabrication Facility within a Unionized Workforce," IEEE 2000 Advanced Semiconductor Manufacturing Conference (ASMC '00), 219-226, 2000. The authors are from Intersil Corp., Mountain Top, PA. |
 | D. E. Bailey, "Modeling Work Group Effectiveness in High-Technology
Manufacturing Environments," IIE Transactions, Vol. 32, 361-367, 2000. |
 | M. J. Brusco and T. R. Johns, "Staffing A Multiskilled Workforce With
Varying Levels Of Productivity: An Analysis Of Cross-Training
Policies," Decision Sciences, Vol. 29, No. 2, 499-515, 1998. |
 | M. J. Brusco, T. R. Johns and J. H. Reed, "Cross-utilization of a
two-skilled workforce," International Journal of Production and
Operations Management, Vol. 8, No. 5-6, 555-564, 1998. |
 | G. M. Campbell, "Cross-Utilization of Workers Whose Capabilities
Differ," Management Science, Vol. 45, No. 5, 722-732, 1999. |
 | H-N Chen and R. Dabbas, "Modeling Staffing Requirements within a
Semiconductor Manufacturing Environment," Proceedings of the 2002
Advanced Semiconductor Manufacturing Conference, Boston, MA, 2002. |
 | J. K. Cochran, D. E. Chu and M. D. Chu, "Optimal Staffing for
Cyclically Scheduled Processes," International Journal of Production
Research, Vol. 35, No. 12, 3393-3403, 1997. |
 | T. Croft, S. Sheamer, and T. Baker, "Wafer Fab Labor Modeling with
Queueing Theory," Proceedings of the 2002 International Symposium on
Semiconductor Manufacturing (ISSM2002), Tokyo, Japan, 2002. |
 | P. Desruelle and H. J. Steudel, "A Queuing Network Model Of A
Single-Operator Manufacturing Workcell With Machine/Operator
Interference," Management Science, Vol. 42, No. 4, 576-590, 1996. |
 | D. Epple, L. Argote, and K. Murphy, "An Empirical Investigation of
the Microstructure of Knowledge Acquisition and Transfer Through Learning by
Doing," Operations Research, Vol. 44, No. 1, 77-86, 1996. |
 | R.M. Feldman, B. L. Deuermeyer, and C. Valdez-Flores, "Utilization of
the Method of Linear Matrix Equations to Solve a Quasi-Birth-Death
Problem," Journal of Applied Probability, Vol. 30, 639-649, 1993. |
 | P. Ferland and A. Labonte, "Manufacturing Efficiency Improvement through Automation of Test Wafer Procedures," IEEE 2004 Advanced Semiconductor Manufacturing Conference (ASMC '04), 321-324, 2004. Authors are from Nat. Semicond. Corp., South Portland, ME, USA. |
 | J. Foster, T. Nugent, and P. Marcoux, "Implementation of Best Known Methods," IEEE 2000 Advanced Semiconductor Manufacturing Conference (ASMC '00), 181-186, 2000. The authors are from TEFEN, USA. |
 | J. W. Fowler, G. L. Hogg, and S. J. Mason, "Workload Control in the
Semiconductor Industry," Production Planning and Control Special Issue
on Workload Control, Vol. 13, No. 7, 568-578, 2002. |
 | H. Gold, "A Simple Queueing Model for the Estimation of Man Machine
Interference in Semiconductor Wafer Fabrication," Operations Research
Proceedings 2001 (OR 2001), Duisburg, Germany, September 2001. |
 | J. Huang and Hsin-Cheng Wu, "Direct Labor Headcount Model Study for Semiconductor Fab Operation-Modulator Design Concept Approach," Proceedings of the 2002 Semiconductor Manufacturing Technology Conference, 98-101, 2002. The authors are from Taiwan Semicond. Manuf. Co., Hsin-Chu, Taiwan. |
 | Y.-F. Hung and I.-H. Chen, "Dynamic Operator Assignment Based on
Shifting Machine Loading," International Journal of Production
Research, Vol. 38, No. 14, 3403-3420, 2000. |
 | Y. Ishii, "Workload Analysis and Productivity Improvement Using Video
Footage," Proceedings of the 2002 International Symposium on
Semiconductor Manufacturing (ISSM2002), Tokyo, Japan, 2002. |
 | M. Kamath and J. L. Sanders, "Modeling Operator/Workstation
Interference in Asynchronous Automatic Assembly Systems," Discrete
Event Dynamic Systems: Theory and Applications 1, 93-124, Kluwer Academic
Publishers, Boston, 1991. |
 | R. C. Kotcher, "How "Overstaffing" at Bottleneck Machines
Can Unleash Extra Capacity," Proceedings of the 2001 Winter Simulation
Conference, Washington, D.C., 1163-1169, 2001. |
 | N. Kroehn, The Impact of Staffing on Cycle Time Evaluated by Simulation, IEEE 2004 Advanced Semiconductor Manufacturing Conference (ASMC '04), 379-382, 2004. Author is from Infineon Technol. AG, Villach, Austria. |
 | Y-F Lee, "A Study of Wafer Fab Direct-Labor Requirement Model by
Cycle-Time Oriented-Method," Proceedings of the 2004 International
Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo, Japan, 2004. |
 | A. Lin and R. A. Razak, "The Effectiveness and Practical Application of Human Resource Development (HRD) Programs in the Semiconductor Industry - A Case Study of SilTerra Malaysia Sdn Bhd," IEEE 2003 Advanced Semiconductor Manufacturing Conference (ASMC '03), 175-187, 2003. Authors are from SilTerra Malaysia Sdn. Bhd, Kedah, Malaysia. |
 | Jeffrey T. Macher and David C. Mowery, "Managing Learning by Doing: An Empirical Study in Semiconductor Manufacturing," Journal of Product Innovation Management, Vol. 20, No. 5, 391-410, 2003. |
 | T. Matsuo, K. Nakamae, and H. Fujioka, Operator Headcount Optimization through VLSI Test Process Simulator with Human Factor, IEEE 2004 Advanced Semiconductor Manufacturing Conference (ASMC '04), 383-388, 2004. Authors are from Dept. of Inf. Syst. Eng., Osaka Univ., Suita, Japan. |
 | J. K. McCreery and L. J. Krajewski, "Improving Performance Using
Workforce Flexibility in an Assembly Environment with Learning and
Forgetting Effects," International Journal of Production Research, Vol.
37, No. 9, 2031-2058, 1999. |
 | E. Molleman and J. Slomp, "Functional Flexibility and Team
Performance," International Journal of Production Research, Vol. 37,
No. 8, 1837-1858, 1999. |
 | S. A. Mosley, T. Teyner, and R. M. Uzsoy, "Maintenance Scheduling And
Staffing Policies In A Wafer Fabrication Facility," IEEE Transactions
on Semiconductor Manufacturing, Vol. 11, No. 2, 316-323, 1998. |
 | K. Nakamae, W. Koga, and H. Fujioka, "Effects of Operator Grouping on the VLSI Final Test Facility Layoutscale," IEEE 2000 Advanced Semiconductor Manufacturing Conference (ASMC '00), 231-236, 2000. The authors are from Fac. of Eng., Osaka Univ. |
 | R. Oechsner, "E-Learning for Microelectronics Manufacturing,"
Proceedings of the 2004 International Symposium on Semiconductor
Manufacturing (ISSM 2004), Tokyo, Japan, 2004. |
 | D.S. O'Ferrell, "Manufacturing Modeling and Optimization,"
Proceedings of the IEEE/SEMI Advanced Semiconductor Manufacturing
Conference, 334-339, 1995. |
 | A. Raviv, "Applications of Queuing Theory and Simulation to Staffing
in the Semiconductor Clean Room Environment," Proceedings of the IEEE/UCS/SEMI
International Symposium on Semiconductor Manufacturing, Austin, TX, 252-256,
1995. |
 | L. Sattler and V. Sohoni, "Participative Management: An Empirical
Study Of The Semiconductor Manufacturing Industry," IEEE Transactions
on Engineering Management, Vol. 46, No. 4, 387-398, 1999. |
 | J. Spier and K. Kempf, "Simulation of Emergent Behavior in
Manufacturing Systems," 1995 IEEE/SEMI Advanced Semiconductor
Manufacturing Conference Proceedings, 90-94. |
 | J. Trujillo, "Command Center Consolidated Operations Resulting in
Increased Labor and Tool Productivity," Proceedings of the 2004
International Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo,
Japan, 2004. |
 | P. T. Ward, P. D. Berger, J. G. Miller, and S. R. Rosenthal,
"Manufacturing Process Technology and Support Staff Composition: An
Empirical View of Industry Evidence," Production and Operations
Management, Vol. 1, No. 1, 5-21, 1992. |
 | K. M. White and P. Schwab, "Ergonomic Methods To Improve Product
Yield And Decrease Cycle Time While Preventing Injuries," Proceedings
of the 2002 International Symposium on Semiconductor Manufacturing
(ISSM2002), Tokyo, Japan, 2002. |
 | S. Wilson, "Talking Shop - Linking Training to Factory Indicators," 2001 IEEE International Symposium on Semiconductor Manufacturing (ISSM '01), 103-106, 2001. The author is from Intel Corp., Rio Rancho, NM. |
 | T. H. Yang, H. P. Fu, and C. W. Yang, "A Simulation-Based Dynamic
Operator Assignment Strategy Considering Machine Interference - A Case Study
on Integrated Circuit Chip Moulding Operations," Production Planning
& Control, Vol. 13, No. 6, 541-551, 2002. |
 | R. Yu, "Modeling the Transportation Manpower of Staffing Requirement
with a Semiconductor Manufacturing Stack Fab," Proceedings of the 2004
International Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo,
Japan, 2004. |

|