bulletShamsuddin Ahmed, Masjuki Hj. Hassan, and Zahari Taha, "TPM Can Go beyond Maintenance: Excerpt from a Case Implementation," Journal of Quality in Maintenance Engineering, Vol. 11, No. 1, 19-42, 2005.
bulletA. Aissani and J. R. Artalejo, "On The Single Server Retrial Queue Subject To Breakdowns," Queueing Systems, Vol. 30, No. 3-4, 309-321, 1998.
bulletR. Akella, B. H. Krogh and M. R. Singh, "Efficient Computation of Coordinating Controls in Hierarchical Structures for Failure-Prone Multi-Cell Flexible Assembly Systems," IEEE Transactions on Robotics and Automation, Vol. 6, No. 6, 659-672, 1990.
bulletR. Akella and P. R. Kumar, "Optimal Control of Production Rate in a Failure Prone Manufacturing System," IEEE Transactions on Automatic Control, Vol. AC-31, No. 2, 116-126, 1986.
bulletB. Avi-Itzhak and P. Naor, "Some Queueing Problems with the Service Station Subject to Breakdown," Operations Research, Vol. 11, May-June 1963.
bulletS. S. Baum and C. M. O'Donnell, "An Approach to Modeling Labor and Machine Down Time in Semiconductor Fabrication," Proceedings of the 1991 Winter Simulation Conference, (eds.) B. L. Nelson, W. D. Kelton, G. M. Clark, 448-454, 1991.
bulletM. Bruggemann, "Interrupt Reduction by Triggering of Maintenance Activities Using APC Machine Alarm Analysis," IEEE 2004 Advanced Semiconductor Manufacturing Conference (ASMC '04), 57-60, 2004. Author is from Infineon Technol. AG, Munich, Germany.
bulletK.-T. Chang, O. Yu, H.W. Chang, Z. Su, and K.-s. Huang, "Automatic Commanding System for Periodic Shut Down & Recovery Plan - Using Real Time Dispatcher to Execute Annual Prevention Maintenance," Proceedings of the 2002 International Symposium on Semiconductor Manufacturing (ISSM2002), Tokyo, Japan, 2002.
bulletA. Federgruen and L. Green, "Queueing Systems with Service Interruptions," Operations Research, Vol. 34, No. 5, 752-768, 1986.
bulletR. W. Freck, "Using Overall Equipment Effectiveness (OEE) and the Equipment Improvement Process (ET) to Improve Fab Throughput," IEEE 2000 Advanced Semiconductor Manufacturing Conference (ASMC '00), 469-471, 2000. The authors are from Resource Dynamics Int., Boca Raton, FL.
bulletJ. Homer, "Macro- and Micro-Modeling of Field Service Dynamics," System Dynamics Review, Vol. 15, No. 2, 139-162, 1999.
bulletW. J. Hopp and S-C Wu, "Machine Maintenance with Multiple Maintenance Actions," IIE Transactions, Vol. 22, No. 3, 226-233, 1990.
bulletK. C. Jeong and Y. D. Kim, "Performance Analysis Of Assembly/Disassembly Systems With Unreliable Machines And Random Processing Times," IIE Transactions, Vol. 30, No. 1, 101-106, 1998.
bulletD. Killeen, P. Gaboury, and D. Paccard, "Measuring and Improving Equipment Capacity and Overall Equipment Efficiency (OEE) using iPLUS," 2001 IEEE International Symposium on Semiconductor Manufacturing (ISSM '01), 25-29, 2001. The authors are from STMicroelectronics, Phoenix, AZ.
bulletC. P. Koulamas, "Job Flow-Time in a Job Shop subject to Machine Breakdowns with Applications in Modeling Job Shop In-Process Inventories," International Journal on System Sciences, Vol. 21, No. 3, 479-486, 1990.
bulletS. Lantz, "An Effective Methodology for Improving Equipment Reliability and Reducing Excursions During a Factory Ramp," IEEE 2003 Advanced Semiconductor Manufacturing Conference (ASMC '03), 297-302, 2003. Intel Corp., Hillsboro, OR, USA.
bulletA. M. Law, "Models of Random Machine Downtimes for Simulation," Proceedings of the 1990 Winter Simulation Conference, 314-317, 1990.
bulletC. Y. Lee and C. S. Lin, "Single-Machine Scheduling with Maintenance and Repair Rate-Modifying Activities," European Journal of Operational Research, Vol. 135, No. 3, 493-513, 2001.
bulletC. J. Liao and W. J. Chen, "Single-Machine Scheduling with Periodic Maintenance and Nonresumable Jobs," Computers & Operations Research, Vol. 30, No. 9, 1335-1347, 2003.
bulletO. Z. Maimon and S. B. Gershwin, "Dynamic Scheduling and Routing for Flexible Manufacturing Systems That Have Unreliable Machines," Operations Research, Vol. 36, No. 2, 279-292, 1988.
bulletB. Mandelbrot, "Self-Similar Error Clusters in Communication Systems and the Concept of Conditional Stationarity," IEEE Transactions of Communication Technology, 71-90, 1964.
bulletT. J. Massie, "Semiconductor Fab Maintenance Challenge and BKM in Downturn Economy," IEEE 2002 Advanced Semiconductor Manufacturing Conference (ASMC '02), 228-230, 2002. The author is from Microelectron. Div., IBM Corp., Essex Junction, VT.
bulletY. Mikata, "Improvement of Fab Availability Simulation by using Semi-Dynamical Model," Proceedings of the 2004 International Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo, Japan, 2004.
bulletY. Mikata, K. Tanimoto, K. Ishii, and S. Oka, "Improvement of Mini-Fab Uptime by Using Multitask and Multifunctional Tools," IEEE Transactions on Semiconductor Manufacturing, Vol. 17, No. 3, 273-280, 2004. Authors are from HALCA Project, Assoc. of Super-Adv. Electron. Technol. (ASET), Ibaraki, Japan.
bulletT. D. Rishel and D. P. Christy, "Incorporating Maintenance Activities into Production Planning: Integration at the Master Schedule Versus Material Requirements Level," International Journal of Production Research, Vol. 34, No. 2, 421-446, 1996.
bulletO. Rose, "Modeling Tool Failures in Semiconductor Fab Simulation," Proceedings of the 2004 Winter Simulation Conference, Washington, DC, Dec. 5-8, 2004.
bulletC. R. Schultz and R. A. Reid, "Spare Parts Inventory and Cycle Time Reduction," International Journal of Production Research, Vol. 42, No. 4, 759-776, 2004.
bulletSEMI, "SEMI E10-92: Guideline for Definition and Measurement of Equipment Reliability, Availability, and Maintainability (RAM).
bulletT. W. Sloan and J. G. Shanthikumar, "Combined Production and Maintenance Scheduling for a Multiple-Product, Single Machine Production System," Production and Operations Management, Vol. 9, No. 4, 379-399, 2000.
bulletR. Varra, "Protecting Process Equipment from Cyber Security Threats," Proceedings of the 2004 International Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo, Japan, 2004.
bulletM. Vineyard, K. Amoako-Gyampah, J. R. Meredith, "Failure Rate Distributions for Flexible Manufacturing Systems: An Empirical Study," European Journal of Operational Research, Vol. 116, No. 1, 139-155, 1999.
bulletXiaodong Yao, E. Fernandez-Gaucherand, M. C. Fu, and S. I. Marcus, "Optimal Preventive Maintenance Scheduling in Semiconductor Manufacturing," IEEE Transactions on Semiconductor Manufacturing, Vol. 17, No. 3, 345-356, 2004. Authors are from SAS Inst. Inc., Cary, NC, USA.

 