|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 10: Due Dates
 | F-C. R. Chang, "A Study of Factors Affecting Due-Date Predictability
in a Simulated Dynamic Job Shop," Journal of Manufacturing Systems,
Vol. 13, No. 6, 393-400, 1994. |
 | P. C. Chang and J. C. Hsieh, "A Neural Networks Approach for Due-Date
Assignment in a Wafer Fabrication Factory," International Journal of
Industrial Engineering - Theory, Applications and Practice, Vol. 10, No. 1,
55-61, 2003. |
 | T. C. E. Cheng and M. C. Gupta, "Survey of Scheduling Research
Involving Due Date Determination Decisions," European Journal of
Operational Research, Vol. 38, No. 2, 156-166, 1989. |
 | C. C. Chiu, P. C. Chang, and N. H. Chiu, "A Case-Based Expert Support
System For Due-Date Assignment In A Wafer Fabrication Factory," Journal
of Intelligent Manufacturing, Vol. 14, No. 3-4, 287-296, 2003. |
 | S.-H. Chung, M.-H. Yang, and C.-M. Cheng, "The Design of Due Date
Assignment Model and the Determination of Flow Control Parameters for the
Wafer Fabrication Factories," IEEE Transactions on Components,
Packaging, and Manufacturing Technology. Part C: Manufacturing, Vol. 20, No.
4, 278-298, 1997. |
 | Y. F. Hung, "Scheduling of Mask Shop E-Beam Writers," IEEE
Transactions on Semiconductor Manufacturing, Vol. 11, No. 1, 165-172, 1998. |
 | Y. D. Kim, J. U. Kim, S. K. Lim, and H. B. Jun, "Due-Date Based
Scheduling And Control Policies In A Multiproduct Semiconductor Wafer
Fabrication Facility, IEEE Transactions on Semiconductor Manufacturing, Vol.
11, No. 1, 155-164 1998. |
 | S. R. Lawrence, "Estimating Flowtimes and Setting Due-Dates in
Complex Production Systems," IIE Transactions, Vol. 27, 657-668, 1995. |
 | S. H. Lu and P. R. Kumar, "Distributed Scheduling Based on Due Dates
and Buffer Priorities," IEEE Transactions on Automatic Control, Vol.
36, No. 12, 1406-1416, 1991. |
 | S. J. Mason and J. W. Fowler, "Maximizing Delivery Performance in
Semiconductor Wafer Fabrication Facilities," Proceedings of the 2000
Winter Simulation Conference, 2000. |
 | O. Rose, "Some Issues of the Critical Dispatch Rule in Semiconductor
Manufacturing," Proceedings of the 2002 Winter Simulation Conference,
2002 (to appear). |
 | O. Rose (University of Würzburg), "Accelerating Products under
Due-Date Oriented Dispatching Rules in Semiconductor Manufacturing,"
Proceedings of the 2003 Winter Simulation Conference, S. Chick, P. J.
Sánchez, D. Ferrin, and D. J. Morrice, eds., 2003. |
 | D. Y. Sha and S. Y. Hsu, "Due-Date Assignment in Wafer Fabrication
using Artificial Neural Networks," International Journal of Advanced
Manufacturing Technology, Vol. 23, No. 9-10, 768-775, 2004. |
 | M. L. Spearman and R. Q. Zhang, "Optimal Lead Time Policies,"
Management Science, Vol. 45, No. 2, 290-295, 1999. |
 | L. M. Wein and P. B. Chevalier, "A Broader View of the Job-Shop
Scheduling Problem," Management Science, Vol. 38, No. 7, 1018-1033,
1992. |

|