|
Back Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 5: Bottlenecks
 | J. Adams, E. Balas and D. Zawack, "The Shifting Bottleneck Procedure
for Job Shop Scheduling," Management Science, Vol. 34, No. 3, 391-401,
1988. |
 | A. Berger, L. Bregman, Y. Kogan, "Bottleneck Analysis In Multiclass
Closed Queueing Networks And Its Application," Queueing Systems, Vol.
31, No. 3-4, 217-237. |
 | T. Egawa, H. Kondo, and S. Nakamura, "Combination Bottlenecks in Full Automated Fab and its Countermeasures," 2003 IEEE International Symposium on Semiconductor Manufacturing (ISSM '03), 279-282, 2003. The authors are from Asyst Shinko Inc., Ise, Japan. |
 | S Kim, SH Yea, B Kim, "Shift Scheduling for Steppers in the
Semiconductor Wafer Fabrication Process," IIE Transactions, Vol. 34,
No. 2, 2002. |
 | Y. H. Lee, J. Park, and S. Kim, "Experimental Study on Input and
Bottleneck Scheduling for a Semiconductor Fabrication Line," IIE
Transactions, Vol. 34, No. 2, 179-190, 2002. |
 | C. Lozinski and C. R. Glassey, "Bottleneck Starvation Indicators for
Shop Floor Control," IEEE Transactions on Semiconductor Manufacturing,
Vol. 1, No. 4, 147-153, 1988. |
 | T. Nakata, K. Matsui, Y. Miyake and K. Nishioka, "Dynamic bottleneck
control in wide variety production factory," IEEE Transactions on
Semiconductor Manufacturing, Vol. 12, No. 3, 273-280, 1999. |

|