|
Up Next
| |
A Bibliography on Capacity Modeling for Semiconductor Manufacturing
Section 1: Reviews, Overviews & Bibliographies
 | S. X. Bai and S. B. Gershwin, "A Manufacturing Scheduler's
Perspective on Semiconductor Fabrication," VLSI Memo No. 89-518,
Massachusetts Institute of Technology, 1989. |
 | J. H. Blackstone, Jr., D. T. Phillips, and G. L. Hogg, "A
State-of-the-Art Survey of Dispatching Rules for Manufacturing Job Shop
Operations," International Journal of Production Research, Vol. 20, No.
1, 27-45, 1982. |
 | J. A. Buzacott, "A Perspective on New Paradigms in
Manufacturing," Journal of Manufacturing Systems, Vol. 14, No. 2, 1995. |
 | F. Chance, J.K. Robinson, and J.W. Fowler, "Supporting Manufacturing
with Simulation: Model Design, Development, and Deployment",
Proceedings of the 1996 Winter Simulation Conference, ed. J.M. Charnes, D.
J. Morrice, D. T. Brunner, and J. J. Swain, 114-121, 1996. |
 | T. C. E. Cheng and D. Bizruchak, "Expert Systems and Production /
Operations Management," International Journal of Production Economics,
Vol. 22, No. 3, 249-257, 1991. |
 | J. F. Cox, J. H. Blackstone, and M. S. Spencer, "APICS Dictionary:
7th Edition," Department of Management, Terry College of Business,
University of Georgia. |
 | S. B. Gershwin, "Hierarchical Flow Control Methods for Manufacturing
Systems," Report No. LMP-90-018, Laboratory for Manufacturing and
Productivity, Massachusetts Institute of Technology, 1990. |
 | S. C. Graves, "A Review of Production Scheduling," Operations
Research, Vol. 29, No. 4, 646-675, 1981. |
 | R.-S. Guo, "Manufacturing and Engineering Collaboration Mechanism
between Foundry and Fabless," Proceedings of the 2004 International
Symposium on Semiconductor Manufacturing (ISSM 2004), Tokyo, Japan, 2004. |
 | G. L. Hogg and J. W. Fowler, "Annotated Bibliography on Order Release
and Dispatching in Wafer Fabrication," SEMATECH Technology Transfer No.
91120785A-XFR, 1991. |
 | G. L. Hogg and J. W. Fowler, "Flow Control in Semiconductor
Manufacturing: A Survey and Projection of Needs," SEMATECH Technology
Transfer No. 9110757A-GEN, 1991. |
 | V. Hlupic and R. J. Paul, "Guidelines for selection of manufacturing
simulation software," IIE Transactions, Vol. 31, No. 1, 21-29, 1999. |
 | B. L. MacCarthy and J. Liu, "Addressing the Gap in Scheduling
Research: A Review of Optimization and Heuristic Methods in Production
Scheduling," International Journal of Production Research, Vol. 31, No.
1, 59-79, 1993. |
 | S. S. Panwalkar and W. Iskander, "A Survey of Scheduling Rules,"
Operations Research, Vol. 25, No. 1, 45-61, 1977. |
 | A. Reisman, A. Kumar, and J. Motwani, "Flowshop Scheduling/Sequencing
Research: A Statistical Review Of The Literature," 1952-1994,"
IEEE Transactions on Engineering Management, Vol. 44, No. 3, 316-329, 1997. |
 | C. S. Tang and L. Demeester, "Mathematical Models in IC
Manufacturing: A Review," The John E. Anderson School of Management at
UCLA, 1991. |
 | R. Uzsoy, C-Y Lee and L. A. Martin-Vega, "A Review of Production
Planning and Scheduling Models in the Semiconductor Industry," Research
Memorandum No. 90-11, Purdue University Department of Industrial
Engineering, 1990. Note that "Part I: System Characteristics,
Performance Evaluation and Production Planning" appeared in IIE
Transactions, Vol. 24, No. 4, 47-60, 1992. Part II: Shop Floor Control
appeared in IIE Transactions, Vol. 26, No. 5, 44-55, 1994. |
 | R. Uzsoy and L. A. Martin-Vega, "Modelling Kanban-based Demand-Pull
Systems. A Survey and Critique," Manufacturing Review, Vol. 3, No. 3,
155-160, 1990. |
 | L. M. Wein, "Scheduling Semiconductor Wafer Fabrication," IEEE
Transactions on Semiconductor Manufacturing, Vol. 1, No. 3, 115-126, 1988. |
 | P. Worhach, Jr. and C. R. Glassey, "A Survey of Pull Based Mechanisms
for Production Control and Work Release," SRC Publication No. C92848,
1993. |

|